Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23DL0040

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23DL0040","ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS 2. CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALING RIVER, ATIMONAN,","Flood Control and Drainage","Completed",49000000,0,100,"Quezon 4th DEO","Region IV-A","R.A. MENDIOLA CONSTRUCTION & DEVELOPER (33651)","2023-02-08","2024-03-12",2023,"Regular Infra - GAA 2023 OO-2",14.00207,121.91775,"405603000","405600000"]
SHA-256
3713349ac3bb057aeec97369c0c542d76f081f80bb66e1f4745d8d20b711e9f2

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.