Project 23DO0055
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23DO0055","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG PURAY RIVER, RODRIGUEZ,","Flood Control and Drainage","Completed",40554378.68,0,100,"Rizal 2nd DEO","Region IV-A","ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)","2023-05-08","2023-09-25",2023,"Regular Infra - GAA 2023 OO-2",14.73835,121.14774,"405808000","405800000"]
SHA-256
461949f1b48053c09424a2f2346e379156f0e7082a619bc321879ac84c4beaafHash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.