Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23DQ0051

DPWH infrastructure contract

This contract as an OC4IDS project record, the infrastructure standard used by OpenGovChain. Download: JSON

{
  "id": "oc4ids-pisoscan-dpwh-23DQ0051",
  "title": "CONSTRUCTION OF RIVERBANK AND SLOPE PROTECTION ALONG SAN ISIDRO RIVER CROSSING, PHASE 2, BARANGAY IBA SECTION, SILANG, CAVITE AND CONSTRUCTION OF RIVERBANK AND SLOPE PROTECTION ALONG SAN ISIDRO RIVER CROSSING GOVERNORS DRIVE (GMA SECTION), PHASE 2, GENERA",
  "sector": [
    "Flood Control and Drainage"
  ],
  "status": "implementation",
  "publicAuthority": {
    "name": "DPWH Cavite 3rd DEO"
  },
  "period": {
    "startDate": "2023-04-11"
  },
  "budget": {
    "amount": {
      "amount": 96499913.14,
      "currency": "PHP"
    }
  },
  "locations": [
    {
      "geometry": {
        "type": "Point",
        "coordinates": [
          120.99968,
          14.29103
        ]
      }
    }
  ],
  "parties": [
    {
      "name": "HGG BUILDERS AND SUPPLY",
      "roles": [
        "supplier"
      ]
    }
  ],
  "contractingProcesses": [
    {
      "id": "23DQ0051",
      "summary": {
        "title": "CONSTRUCTION OF RIVERBANK AND SLOPE PROTECTION ALONG SAN ISIDRO RIVER CROSSING, PHASE 2, BARANGAY IBA SECTION, SILANG, CAVITE AND CONSTRUCTION OF RIVERBANK AND SLOPE PROTECTION ALONG SAN ISIDRO RIVER CROSSING GOVERNORS DRIVE (GMA SECTION), PHASE 2, GENERA",
        "status": "active",
        "contractValue": {
          "amount": 96499913.14,
          "currency": "PHP"
        }
      }
    }
  ],
  "pisoscan": {
    "dpwhStatus": "On-Going",
    "physicalProgressPercent": 100,
    "fundingSource": "Regular Infra - GAA 2023 CSSP",
    "sourceDataset": "DPWH contract list via BetterGov.ph",
    "sha256": "a4d75f19c1bd48fa186405852b41508c9d0556a7f91dc93b033fab0410035ef5"
  }
}