Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23DQ0052

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23DQ0052","CONSTRUCTION OF BANK SLOPE STRUCTURE ALONG SAN ISIDRO RIVER, PHASE 2, SILANG, CAVITE","Flood Control and Drainage","Completed",96494219.39,0,100,"Cavite 3rd DEO","Region IV-A","HGG BUILDERS & SUPPLY (17824)","2023-04-11","2024-11-15",2023,"Regular Infra - GAA 2023 OO-2",14.2297,120.98424,"402118000","402100000"]
SHA-256
1651e219e8385be48d1d51bbf2160341e790164369c1995dbc1700b9301e1134

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.