Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23DQ0088

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23DQ0088","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CARMONA RIVER (UPSTREAM) AT BRGY. LANTIC, CARMONA, CAVITE","Flood Control and Drainage","On-Going",86299531.61,0,95.15,"Cavite 3rd DEO","Region IV-A","OMNICON BUILDERS (22816)","2023-05-17",null,2023,"Regular Infra - GAA 2023 OO-2",14.29942,121.03567,"402104000","402100000"]
SHA-256
707d6c4a28035a150c6b77805bfa7b8103517aecbe6543d16c3e41da9c0c32dd

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.