Project 23E00137
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23E00137","SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF SLOPE PROTECTION STRUCTURE ALONG ABRA DE ILOG ROAD, UDALO SECTION (PHASE 2), OCC. MINDORO","GAA 2023 CSSP","Completed",96497853.12,0,100,"MIMAROPA Region","MIMAROPA Region","JELSIE CONSTRUCTION & SUPPLY (44943)","2023-04-13","2023-08-21",2023,"Regular Infra - GAA 2023 CSSP",13.46886,120.82887,"1705101000","1705100000"]
SHA-256
d9462135e67f6c92e61863d48baaab4838b0089a91bceaf7c4bc2b0003652a01Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.