Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23EH0080

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23EH0080","REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE ALONG LOOC (COGON TULAY) - ODIONGAN RD - K0113+900 - K0113+915, TABLAS ISLAND, ROMBLON","GAA 2023 OO-1","Completed",1467997.6,0,100,"Romblon DEO","MIMAROPA Region","R N V CONSTRUCTION (12570) / TABLAS CONSTRUCTION CORPORATION (45015)","2023-03-31","2023-04-29",2023,"Regular Infra - GAA 2023 OO-1",12.33237,122.02144,"1705907000","1705900000"]
SHA-256
d14fa2ebf84c31275fb499ffaef0c21bb2bc223e6a52a561fa0a759b7ff403d1

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.