Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23F00120

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23F00120","OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BATONG PALOWAY, SAN ANDRES, CATANDUANES, SAN ANDRES, C","GAA 2023 OO-2","On-Going",115603846,0,93.19,"Region V","Region V","BICOL GOLDROCK CONSTRUCTION CORPORATION (32376)","2023-07-14",null,2023,"Regular Infra - GAA 2023 OO-2",13.61156,124.08598,"502008000","502000000"]
SHA-256
027e07cb2718e78e1082c9c5ff18dbb65aee659a4d2948c535652ad5aa0f8011

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.