Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23FB0072

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23FB0072","BIP - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD PROTECTION (DIKE) ALONG BRGY. PAWA - BOGTONG (PHASE 2), LEGAZPI CITY, ALBAY","Flood Control and Drainage","Completed",19293298.65,0,100,"Albay 2nd DEO","Region V","FIRST OMB CONSTRUCTION AND DEVELOPMENT CORP. (46481)","2023-04-05","2023-07-12",2023,"Regular Infra - GAA 2023 CSSP",13.16624,123.74143,"500506000","500500000"]
SHA-256
46bb0e2945264693ba3d93e05a09bca8b742fe7d2a4b4fea4e41453a9f8c44d3

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.