Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23FB0090

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23FB0090","002 - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION/UPGRADING/REHABILITATION OF FLOOD MITIGATION SYSTEM AT BARANGAY SALVACION TO BARANGAY MALABOG RIVER, DARAGA, ALBAY","Flood Control and Drainage","Completed",72342833.02,0,100,"Albay 2nd DEO","Region V","MUNTOPAR BUILDERS CORP. (29800)","2023-04-05","2023-10-31",2023,"Regular Infra - GAA 2023 OO-2",13.17241,123.68194,"500503000","500500000"]
SHA-256
73e6f0f7182143322c5f01620ca23265e0b32aafa02bd4e7465c5be5f305e6f7

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.