Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23FB0130

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23FB0130","BIP: CONSTRUCTION OF ROAD WITH SLIP SLOPE COLLAPSE & LANDSLIDE PROTECTION, BRGY. BUENAVISTA - SAN ISIDRO ROAD, BUENAVISTA - SAN ISIDRO SECTION, LEGAZPI CITY, ALBAY (PHASE 1)","Roads","Completed",98998222.66,0,100,"Albay 2nd DEO","Region V","SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) (15906)","2023-05-03","2024-04-15",2023,"Regular Infra - GAA 2023 CSSP",13.04017,123.81278,"500506000","500500000"]
SHA-256
bc8262e2ef8f4e673ba877d8fd3ab246aa13c5496a203e621b44df3fb37f2a18

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.