Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23FB0158

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23FB0158","OO2: CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL SYSTEM PROJECT IN PUROK 1, 3, 4 AND 7, LIBOD, CAMALIG, ALBAY","Flood Control and Drainage","On-Going",70147335.91,0,87.76,"Albay 2nd DEO","Region V","NEXT GENERATION CONSTRUCTION AND SUPPLY CORPORATION (40088)","2023-07-03",null,2023,"Regular Infra - GAA 2023 OO-2",13.17774,123.63122,"500502000","500500000"]
SHA-256
c0d379a7b1baa53a11b7a3f042ccc35536582b8483059f80e6ac8d18f43889a8

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.