Project 23FC0043

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23FC0043","CONSTRUCTION / REHABILITATION OF FLOOD PROTECTION MEASURES AT BARANGAY BASIAD, STA. ELENA, CAMARINES NORTE","Flood Control and Drainage","Completed",17639257.98,0,100,"Camarines Norte DEO","Region V","EUS CONSTRUCTION (21878)","2023-04-05","2023-08-26",2023,"Regular Infra - GAA 2023 OO-2",14.15653,122.33688,"501610000","501600000"]
SHA-256
e430cfa6f293be2b34f431df119da1c3ec641976de59e00cc96ff7321b345b5c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.