Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23FC0062

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23FC0062","CONSTRUCTION OF FLOOD CONTROL STRUCTURE (PHASE 2) AT BRGY. MABILO, LABO, CAMARINES NORTE, BRGY. MABILO II, LABO, CAMARINES","Flood Control and Drainage","Completed",48999703.48,0,100,"Camarines Norte DEO","Region V","C.B. GARAY PHILWIDE BUILDERS (6004)","2023-05-03","2024-05-13",2023,"Regular Infra - GAA 2023 CSSP",14.11395,122.95964,"501603000","501600000"]
SHA-256
ce7d30f6132561a1b85b4567e3cd7f60a4b34add76c88521dead43e5de3a4156

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.