Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23FE0059

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23FE0059","OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL ALONG LIBMANAN RIVER, BRGY. MAMBAYAWAS, LIBMANAN, CAMARINES SUR","Flood Control and Drainage","Completed",72239845.66,0,100,"Camarines Sur 2nd DEO","Region V","G.C.I.  CONSTRUCTION AND DEV'T. CORP. (11346)","2023-04-05","2024-01-31",2023,"Regular Infra - GAA 2023 OO-2",13.71524,123.00441,"501718000","501700000"]
SHA-256
2c980b7850b5d7a5f711ad295fdfbd25fa9478ca1f3ac3f08ce906df3d9fa8c3

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.