Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23FE0107

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23FE0107","CSSP: CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR LEVEL 2 WATER SYSTEM AT BRGY. SAN RAMON, PAMPLONA, CAMARINES SUR","Water Provision and Storage","Completed",9800000,0,100,"Camarines Sur 2nd DEO","Region V","SHLA CONSTRUCTION AND SUPPLY (45590)","2023-09-05","2024-02-29",2023,"Regular Infra - GAA 2023 CSSP",13.60669,123.04387,"501726000","501700000"]
SHA-256
7aaa3bb5010db100df6bb335e588422317b8bfa6fb9c6ab0eee7f8ab8e76f49f

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.