Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23FF0019

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23FF0019","002;CONST./REHAB/OF FLOOD PROTECTION MEASURES ALONG HIBAGO RIVER FLOOD MITIGATION STRUCTURE,RIGHT SIDE,UPSTREAM OF HIBAGO BRIDGE BRGY. PINIT OCAMPO CAMARINES SUR","Flood Control and Drainage","Completed",57194183,0,100,"Camarines Sur 3rd DEO","Region V","PHILWORKS CONSTRUCTION & SUPPLY (32103)","2023-02-20","2023-10-06",2023,"Regular Infra - GAA 2023 OO-2",13.56819,123.39846,"501725000","501700000"]
SHA-256
490043bfbaf7a115ddbc798f24c25a21e0c2f5941c61de35b215be3bf7e7b23a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.