Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23FG0040

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23FG0040","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG RANGAS RIVER, CATAGBACAN (PHASE-2) GOA, CAMARINES SUR","Flood Control and Drainage","Completed",95536200,0,100,"Camarines Sur 4th DEO","Region V","BICOL GOLDROCK CONSTRUCTION CORPORATION (32376)","2023-02-26","2024-08-27",2023,"Regular Infra - GAA 2023 CSSP",13.67654,123.50307,"501715000","501700000"]
SHA-256
e845ffeb23b89655fd1a8cff8b2c983826f3ba40c8fe52ac7284c0942f6bbc76

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.