Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23FN0013

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23FN0013","CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF BANK PROTECTION STRUCTURE ALONG BICOL RIVER, SAN ROQUE SECTION, BULA, CAMARINES SUR","Flood Control and Drainage","Completed",96456652.25,0,100,"Camarines Sur 5th DEO","Region V","RAPIDWORKZ CONSTRUCTION & SUPPLY (46643) / STEVEN CONSTRUCTION & SUPPLY (21987)","2023-02-17","2023-07-24",2023,"Regular Infra - GAA 2023 CSSP",13.45998,123.26534,"501706000","501700000"]
SHA-256
9dc833d9a806588b0c55fbc77e4ceeb663927552e6986c70792c0d5daa36fc7f

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.