Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23FN0016

DPWH infrastructure contract

This contract as an OC4IDS project record, the infrastructure standard used by OpenGovChain. Download: JSON

{
  "id": "oc4ids-pisoscan-dpwh-23FN0016",
  "title": "CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF BANK PROTECTION STRUCTURE ALONG BICOL RIVER, OMBAO POLPOG SECTION, BULA, CAMARINES SUR",
  "sector": [
    "Flood Control and Drainage"
  ],
  "status": "completed",
  "publicAuthority": {
    "name": "DPWH Camarines Sur 5th DEO"
  },
  "period": {
    "startDate": "2023-02-17",
    "endDate": "2023-08-25"
  },
  "budget": {
    "amount": {
      "amount": 96386086.27,
      "currency": "PHP"
    }
  },
  "locations": [
    {
      "geometry": {
        "type": "Point",
        "coordinates": [
          123.24316,
          13.47174
        ]
      }
    }
  ],
  "parties": [
    {
      "name": "WELEX CONSTRUCTION, INCORPORATED (FORMERLY WELEX C",
      "roles": [
        "supplier"
      ]
    }
  ],
  "contractingProcesses": [
    {
      "id": "23FN0016",
      "summary": {
        "title": "CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF BANK PROTECTION STRUCTURE ALONG BICOL RIVER, OMBAO POLPOG SECTION, BULA, CAMARINES SUR",
        "status": "closed",
        "contractValue": {
          "amount": 96386086.27,
          "currency": "PHP"
        }
      }
    }
  ],
  "pisoscan": {
    "dpwhStatus": "Completed",
    "physicalProgressPercent": 100,
    "fundingSource": "Regular Infra - GAA 2023 CSSP",
    "sourceDataset": "DPWH contract list via BetterGov.ph",
    "sha256": "5c63224dced56122dae8f12a7d8c68232b149b28c0b1de665a3334c4792ff995"
  }
}