Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23FO0034

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23FO0034","CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF LEVEL III WATER SUPPLY SYSTEM IN JOVELLAR, ALBAY","Water Provision and Storage","Completed",39200000,0,100,"Albay 3rd DEO","Region V","HKP CONSTRUCTION AND SUPPLY (34274)","2023-10-02","2024-08-31",2023,"Regular Infra - GAA 2023 CSSP",13.07877,123.60946,"500505000","500500000"]
SHA-256
9af9b92ceab77f415cf5be37c7c4e8e4bf84c6a9929980ca80fcb7821b035e0d

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.