Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23GF0080

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23GF0080","CONSTRUCTION OF SAN JOSE FLOOD CONTROL STRUCTURE, MIAG-AO, ILOILO","Flood Control and Drainage","Completed",96353234.03,0,100,"Iloilo 1st DEO","Region VI","A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY) (3466)","2023-03-23","2024-11-19",2023,"Regular Infra - GAA 2023 CSSP",10.71162,122.20334,"603030000","603000000"]
SHA-256
eae1f786520521a7ed351b8dbf118f097e8f08b099d8601ffd5b8be45c1b991f

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.