Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23GI0030

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23GI0030","CONSTRUCTION OF AGANAN FLOOD CONTROL STRUCTURE (JARO-AGANAN RIVER), BARANGAY POBLACION, ALIMODIAN, ILOILO","Flood Control and Drainage","Completed",96499391.23,0,100,"Iloilo 4th DEO","Region VI","A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY) (3466)","2023-02-10","2024-02-17",2023,"Regular Infra - GAA 2023 OO-2",10.81956,122.43467,"603002000","603000000"]
SHA-256
2c78222d9f58033c69ddb6ae62f568d938aea8c3611db0584e610c1448efdfa8

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.