Project 23GK0003

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23GK0003","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE: CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MINABUNO RIVER, CADIZ CITY, NEGROS OCCIDENTAL","Flood Control and Drainage","Completed",39198000,0,100,"Negros Occidental 1st DEO","Negros Island Region","A.C. RIVERO DEVELOPMENT CORPORATION (5122)","2023-02-13","2023-08-20",2023,"Regular Infra - GAA 2023 OO-2",10.9142,123.32933,"1804504000","1804500000"]
SHA-256
e16cb2331ce36fc69200482f5cacac67610472e946c6d49681030e311ed84d07

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.