Project 23GL0062
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23GL0062","CONSTRUCTION OF BINALBAGAN RIVER BANK SLOPE PROTECTION UPSTREAM OF BINALBAGAN BRIDGE ALONG BACOLOD SOUTH ROAD, BRGY. PALAYOG (PHASE IV, LEFT BANK) HINIGARAN, NEGROS OCCIDENTAL","Flood Control and Drainage","Completed",98993348.2,0,100,"Negros Occidental 2nd DEO","Negros Island Region","LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)","2023-04-12","2023-12-13",2023,"Regular Infra - GAA 2023 CSSP",10.21044,122.88653,"1804511000","1804500000"]
SHA-256
3b27d44681d1cbf2ec8ed40a560b886e16473f01492faa940c58722324e1ac90Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.