["dpwh","23GL0079","CONSTRUCTION OF BINALBAGAN RIVER BANK SLOPE PROTECTION DOWNSTREAM OF BINALBAGAN (BAGACAY) BRIDGE ALONG HINIGARAN-ISABELA ROAD, BRGY. ARANDA (PHASE IV, LEFT BANK), HINIGARAN, NEGROS OCCIDENTAL","Flood Control and Drainage","Completed",49500000,0,100,"Negros Occidental 2nd DEO","Negros Island Region","LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)","2023-03-23","2023-10-05",2023,"Regular Infra - GAA 2023 CSSP",10.22742,122.95356,"1804514000","1804500000"]
SHA-256
c51bdd6dfa087a25d0be3324d6ae4a371cb802467d8f891b98d67a7c70d946bfHash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.