Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23H00022

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23H00022","OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROG, CONSTN/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF LOBOC RIVER CONTROL STRUCTURE, VALLADOLID SECTION, LOBOC, BOHOL","Flood Control and Drainage","On-Going",214734218.71,0,66.72,"Region VII","Region VII","HGG BUILDERS & SUPPLY (17824)","2023-03-23",null,2023,"Regular Infra - GAA 2023 OO-2",9.63252,124.01739,"701229000","701200000"]
SHA-256
1836ccc2d7d3c396d78dd4cafd44fec2dfb5f3c1cfe9acca611d9fce7e330bf8

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.