Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23HA0076

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23HA0076","CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINANGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT UPSTREAM AND DOWNSTREAM OF BOX CULVERT AT TAGBILARAN NORTH RD (TAGBILARAN-JETAFE SECTION) K0051+312, TUBIGON, BOHOL","Flood Control and Drainage","Completed",9785651.71,0,100,"Bohol 1st DEO","Region VII","3N CONSTRUCTION & SUPPLY (37872)","2023-05-12","2023-11-17",2023,"Regular Infra - GAA 2023 OO-2",9.93649,123.94839,"701245000","701200000"]
SHA-256
056c389fe5bcc1e8d9de6493185a666b90c7a68e5e0233c62806f85e8d530afe

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.