Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23HA0127

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23HA0127","CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DRAINAGE STRUCTURE, JCT. TAGBILARAN NORTH ROAD K0002+170 AND PEÑAFLOR STREET LEADING TO OUTFALL, BRGYS. COGON, BOOY AND TALOTO, TAGBILARAN CITY, BOHOL (PHASE 1","Flood Control and Drainage","Completed",72150000,0,100,"Bohol 1st DEO","Region VII","LABB CONSTRUCTION DEVELOPMENT INC. (FORMERLY: LABB CONSTRUCTION) (13524)","2023-11-10","2024-06-23",2023,"Regular Infra - GAA 2023 OO-2",9.66638,123.85536,"701242000","701200000"]
SHA-256
43637fc95d716694b82938480d4cb3d40b3f2e7f6e37747a3568b50e6b3f0a61

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.