Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23HB0068

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23HB0068","CONVERGENCE AND SPECIAL SUPPORT PROGRAM BASIC INFRASTRUCTURE PROGRAM BIP - FLOODMITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES CONSTRUCTION OF FLOOD CONTROL  STRUCTURE ALONG WAHIG RIVER, SIERRA BULLONES, BOHOL STA.0+640.00-STA.0+894.","Flood Control and Drainage","Completed",98999836.9,0,100,"Bohol 3rd DEO","Region VII","CLAIRE CONSTRUCTION AND SUPPLY CORPORATION (38345) / MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY (9354)","2023-04-25","2024-04-15",2023,"Regular Infra - GAA 2023 CSSP",9.80417,124.29116,"701240000","701200000"]
SHA-256
b0a002acbb369088fbfaf23f36e31a7e761fd4f185cf209db2f07f05ba535e43

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.