Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23HB0155

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23HB0155","CONSTRUCTION OF 1STY 1CL, CONCEPCION NATIONAL HIGH SCHOOL, MABINI, BOHOL","Buildings and Facilities","Completed",3306809.94,0,100,"Bohol 3rd DEO","Region VII","WBV CONSTRUCTION (42790)","2023-08-18","2024-02-01",2023,"Outside Infra - GAA 2023 DepEd BEFF",9.88262,124.55812,"701231000","701200000"]
SHA-256
36953aac376a1d910640398f06069e11dd6e6d40e37690e39201ebbeae1e56d0

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.