Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23HB0179

DPWH infrastructure contract

This contract as an OC4IDS project record, the infrastructure standard used by OpenGovChain. Download: JSON

{
  "id": "oc4ids-pisoscan-dpwh-23HB0179",
  "title": "RECONSTRUCTION OF THE TIGBAO BRIDGE IN BAGUMBAYAN, LOBOC, PROVINCE OF BOHOL INTO A REINFORCED CONCRETE DECK GIRDER (RCDG) BRIDGE, INCLUDING ROAD APPROACH WIDENING AND RIVER SLOPE PROTECTION ON EACH SIDE OF THE BRIDGE, LOBOC, BOHOL STA. 0+006.00 - STA. 0+0",
  "sector": [
    "GAA 2023 CSSP"
  ],
  "status": "implementation",
  "publicAuthority": {
    "name": "DPWH Bohol 3rd DEO"
  },
  "period": {
    "startDate": "2024-04-30"
  },
  "budget": {
    "amount": {
      "amount": 241194476.69,
      "currency": "PHP"
    }
  },
  "locations": [
    {
      "geometry": {
        "type": "Point",
        "coordinates": [
          124.04034,
          9.66609
        ]
      }
    }
  ],
  "parties": [
    {
      "name": "GICAR CONSTRUCTION, INC. (12624) / KMCM BUILDERS AND DEVELOPMENT CORPORATION",
      "roles": [
        "supplier"
      ]
    }
  ],
  "contractingProcesses": [
    {
      "id": "23HB0179",
      "summary": {
        "title": "RECONSTRUCTION OF THE TIGBAO BRIDGE IN BAGUMBAYAN, LOBOC, PROVINCE OF BOHOL INTO A REINFORCED CONCRETE DECK GIRDER (RCDG) BRIDGE, INCLUDING ROAD APPROACH WIDENING AND RIVER SLOPE PROTECTION ON EACH SIDE OF THE BRIDGE, LOBOC, BOHOL STA. 0+006.00 - STA. 0+0",
        "status": "active",
        "contractValue": {
          "amount": 241194476.69,
          "currency": "PHP"
        }
      }
    }
  ],
  "pisoscan": {
    "dpwhStatus": "On-Going",
    "physicalProgressPercent": 81.77,
    "fundingSource": "Regular Infra - GAA 2023 CSSP",
    "sourceDataset": "DPWH contract list via BetterGov.ph",
    "sha256": "8fd8382b91366c8b82cbf325f3a0d38a1ba8caaf6e717c26f264b77b709b39e7"
  }
}