Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23HI0128

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23HI0128","CONSTRUCTION OF 1STY3CL, CAMPO INTEGRATED SCHOOL, SAN FRANCISCO, CEBU","Buildings and Facilities","Completed",9989101.61,0,100,"Cebu 5th DEO","Region VII","BARR STEEL CONSTRUCTION (24431)","2023-08-31","2024-01-27",2023,"Outside Infra - GAA 2023 DepEd BEFF",10.65174,124.33777,"702242000","702200000"]
SHA-256
507cf8b8ee9f5e7d38d3421cae6d3dfd84769fe02f12c58caacde5b1e3b5336c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.