Project 23HO0074
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23HO0074","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF RIVER RETAINING WALL AT BRGY. COLABTINGON (RIGHT SIDE), DU","Flood Control and Drainage","Completed",96492809.55,0,100,"Cebu 7th DEO","Region VII","QM BUILDERS (30743)","2023-03-23","2023-08-22",2023,"Regular Infra - GAA 2023 OO-2",10.14183,123.55229,"702210000","702200000"]
SHA-256
34303a3728aa93ac014c91d6709ae8a0539b73d24ee6235d7ce9b38b234b2da9Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.