Project 23HO0165
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23HO0165","CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVER CONTROL STRUCTURE AT BARANGAY PAWA, DUMANJUG, CEBU","Flood Control and Drainage","Completed",94860000,0,100,"Cebu 7th DEO","Region VII","QM BUILDERS (30743)","2023-04-11","2023-12-15",2023,"Regular Infra - GAA 2023 CSSP",10.02222,123.48185,"702224000","702200000"]
SHA-256
7df571a55a28e4d2249b013fc81e3af531cb0a4d12d0c5ebcb7411b77e232030Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.