Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23HO0230

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23HO0230","REPAIR/REHABILITATION/RECONSTRUCTION OF GINATILAN RIVER FLOOD CONTROL SYSTEM, GINATILAN, CEBU, STA. 0+000.00 TO STA. 0+130.00","Flood Control and Drainage","Completed",93358722,0,100,"Cebu 7th DEO","Region VII","QM BUILDERS (30743)","2023-08-10","2024-04-24",2023,"Regular Infra - GAA 2023 CSSP",9.57155,123.3168,"702225000","702200000"]
SHA-256
cdf6b276199f46421c79cf039d622f7affdaa3f7da2bd2a39b4a975e6124fb8d

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.