Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23HO0236

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23HO0236","REPAIR/REHABILITATION/RECONSTRUCTION OF MONTAÑEZA RIVER FLOOD CONTROL SYSTEM (UPSTREAM-SECTION 2), MALABUYOC, CEBU","Flood Control and Drainage","Completed",95377254.06,0,100,"Cebu 7th DEO","Region VII","JUSTBILT BUILDERS (39754) / NEWBIG FOUR J CONSTRUCTION INC. (FORMERLY: FOUR J CONSTRUCTION) (15104)","2023-08-10","2024-06-09",2023,"Regular Infra - GAA 2023 CSSP",9.68823,123.33046,"702229000","702200000"]
SHA-256
a4eefe4c03538ba494de74cb436dcd3742ecb98414a1302d7ca641ef96044b29

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.