Project 23HO0272
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23HO0272","CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION ALONG TALABA RIVER (SITIO CANSIBOG - SITI","Unprogrammed Appropriations 2023","Completed",96495251.97,0,100,"Cebu 7th DEO","Region VII","LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)","2023-12-27","2024-06-19",2023,"Outside Infra - Unprogrammed Appropriations 2023",9.98033,123.43418,"702239000","702200000"]
SHA-256
e10036c5a48f12699d07c44a9829a1a82d5da66683cfe367e014115b6dc3dc7fHash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.