Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23IJ0010

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23IJ0010","OO2: CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JIBATANG RIVER, BARANGAY BASUD CALBAYOG CITY, SAMAR","Flood Control and Drainage","Completed",52938612,0,100,"Samar 1st DEO","Region VIII","ND CARANZO BUILDERS AND CONSTRUCTION SUPPLY (39145)","2023-03-15","2023-11-12",2023,"Regular Infra - GAA 2023 OO-2",12.06481,124.53861,"806003000","806000000"]
SHA-256
eaf74a7fc3d9fcb535924688743d245de25f52081111ba185a33c617de14e634

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.