Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23IK0058

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23IK0058","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANTIAO RIVER, BRGY. SAN ANDRES, CATBALOGAN CITY, SAMAR","Flood Control and Drainage","On-Going",29399094.43,0,100,"Samar 2nd DEO","Region VIII","PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION) (6302)","2023-04-18",null,2023,"Regular Infra - GAA 2023 CSSP",11.78549,124.89861,"806005000","806000000"]
SHA-256
555d9c38943826e900b2b302f7c68697faec5cb421dcd8d4bd48d3d3f1e7f2ef

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.