Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23J00033

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23J00033","CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE (REVETMENT WALL) ALONG SIBUGUEY RIVER, BARANGAY SANTA BARBARA, IMELDA, ZAMBOANGA SIBUGAY","Flood Control and Drainage","Completed",96499965.23,0,100,"Region IX","Region IX","BADSBRO CONSTRUCTION AND GENERAL MERCHANDISE (32876)","2023-05-22","2024-01-19",2023,"Regular Infra - GAA 2023 OO-2",7.65062,122.92993,"908304000","908300000"]
SHA-256
7b4338fdc42a582c2263c0a207494ebf09e2f69138207e6f87df552ed5bf1e91

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.