Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23J00056

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23J00056","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SAAZ RIVER, SAN RAMON BRIDGE 2, ALONG ZAMBOANGA CITY-LABUAN-LIMPAPA ROAD (S01185MN) SAN RAMON, ZAMBOANGA CITY","GAA 2023 OO-2","On-Going",101222107.63,0,90.42,"Region IX","Region IX","HMI ENTERPRISES (42469) / ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)","2023-02-15",null,2023,"Regular Infra - GAA 2023 OO-2",6.98522,121.94162,"931700000","907300000"]
SHA-256
9d582379fede04f4ea341a610598bd09236a25a8062fe65d7b7d82f0ff3a9733

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.