Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23J00107

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23J00107","CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BOGAYO RIVER, KUMALARANG BR. 1 SECTION (B00549MN) (DOWNSTREAM - RIGHTSIDE) ALONG PAGADIAN CITY - ZAMBOANGA CITY ROAD (S01453MN), BAR","Flood Control and Drainage","On-Going",105884397.28,0,100,"Region IX","Region IX","RUDHIL CONSTRUCTION & ENTERPRISES, INC.(FORMERLY R (22901)","2023-07-21",null,2023,"Regular Infra - GAA 2023 OO-2",7.78007,123.17728,"907311000","907300000"]
SHA-256
7ccfdbb01fdbafa901d95d927e3f81f8dbe817ef45c3099a6ea1a1add50d4488

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.