Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23JB0046

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23JB0046","CONSTRUCTION OF 135 CAPACITY BARRACKS, CAMP PIÑAN MILITARY RESERVATION BARANGAY DEL PILAR, PIÑAN,ZN","Buildings and Facilities","Completed",1479980.4,0,100,"Zamboanga del Norte 1st DEO","Region IX","BTM CONSTRUCTION AND ENTERPRISES (40015)","2023-03-01","2023-06-08",2023,"Regular Infra - GAA 2023 CSSP",null,null,null,"907200000"]
SHA-256
d801c287d0a27f4314826a88004229e682b9dc8d03a5c237d54af510be06546a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.