Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23KJ0038

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23KJ0038","CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM -TRIP), ACCESS ROAD LEADING TO MANSAWAN FALLS, DON VICTORIANO, MISAMIS OCCIDENTAL","Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry), Roads: Construction - PCCP","Completed",93604961.06,0,100,"Misamis Occidental 2nd DEO","Region X","MINDANAO ROCK (23479)","2023-04-27","2023-11-15",2023,"Regular Infra - Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry), Roads: Construction - PCCP",8.30255,123.59267,"1004217000","1004200000"]
SHA-256
645b4915eaf30d1ccabc5baf820b768b39c9971bb1a3a87058b6da783c9b5144

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.