Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23KK0013

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23KK0013","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALATUKAN RIVER, BARANGAY MAMBAYAAN, BALINGASAG, MISAMIS ORIENTAL","Flood Control and Drainage","Completed",96500000,0,100,"Misamis Oriental 1st DEO","Region X","ROAD EDGE TRADING & DEVELOPMENT SERVICES (33140)","2023-04-20","2023-10-16",2023,"Regular Infra - GAA 2023 OO-2",8.7779,124.77763,"1004302000","1004300000"]
SHA-256
baed1fd7a0c796bab87c5bb571789ed924713b1087d4b22cc12e24628067aeeb

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.