Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23KL0072

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23KL0072","CONSTRUCTION OF FLOOD CONTROL STRUCTURE, MANTICAO RIVER (DOWNSTREAM OF MANTICAO BRIDGE), MANTICAO, MISAMIS ORIENTAL","Flood Control and Drainage","Completed",4950000,0,100,"Misamis Oriental 2nd DEO","Region X","H & N BUILDERS & ENTERPRISES (41819)","2023-03-28","2023-07-29",2023,"Regular Infra - GAA 2023 CSSP",8.40663,124.29257,"1004318000","1004300000"]
SHA-256
ae66966669ecaa412d40a1d4e3c90b4b7de2e546aa4cc3a5a71650acc05801b0

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.