Project 23LB0129
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23LB0129","CONSTRUCTION OF NRJ DAANG MAHARLIKA ROAD, BARANGAY SAN ISIDRO - TO FATIMA - MALABOG ROAD VIA MALATIVAS, PHASE 2, DAVAO CITY","Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Construction - PCCP","On-Going",137999773.62,0,99.15,"Davao City DEO","Region XI","METRO GEAR CONSTRUCTION CORP. (43024)","2023-04-20",null,2023,"Regular Infra - Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Construction - PCCP",7.24225,125.62825,"1130700000","1102400000"]
SHA-256
07f985647b60f5ad1aa9c96138046078fac02da54917cf015631c9928826ff7cHash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.