Project 23LB0144

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23LB0144","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUNAWAN RIVER STA. 5 + 610 - STA. 5 + 940, EAST SIDE, RIGHT BANK, DAVAO CITY","Flood Control and Drainage","Completed",99000000,0,100,"Davao City DEO","Region XI","GENESIS88 CONSTRUCTION INC. (40999)","2023-05-30","2024-05-06",2023,"Regular Infra - GAA 2023 CSSP",7.2476,125.64809,"1130700000","1102400000"]