Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23LD0041

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23LD0041","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, PADADA-MAINIT RIVER(TANWALANG SECTION), SULOP, DAVAO DEL SUR","Flood Control and Drainage","Completed",96500000,0,100,"Davao del Sur DEO","Region XI","LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)","2023-03-21","2023-12-01",2023,"Regular Infra - GAA 2023 OO-2",6.62848,125.27044,"1102414000","1102400000"]
SHA-256
e636a01b5b1ca2621557465ef145a1ad7c54f5e13860225140c1a5793900d890

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.